Assessment of the REN's renewable production hosting capacity (HOST RENew)

Type: Contract Project

Duration: from 2021 Jun 01 to 2022 Sep 30

Financed by: ERSE - Entidade Reguladora dos Serviços Energéticos

Prime Contractor: R - INESC-ID Lisboa (Other) - Lisboa, Portugal

Analysis of the Portuguese transmission grid w.r.t. to the capacity available to receive new renewable production from photovoltaics.
Identification of the main capacity limitations that derive from the application of the planning criteria in force to the information disclosed by the operator on the characteristics of grid equipment, generation injections and interconnection flows, in typical peak and off-peak loading scenarios.

Partnerships

  • R - INESC-ID Lisboa (Other) - Lisboa, Portugal

Principal Investigators

Members